Northeast Plant City Area Master Plan Preferred Land Use Scenario Map Update

Overview

By the 2040 planning horizon year, the Planning Commission projects Plant City to have a population of more than 65,000, with much of this residential growth envisioned to be in northeast Plant City. Recognizing this trend well in advance of the current growth, in 2008 the City developed and adopted the Northeast Plant City Area Master Plan which is delineated as the northeast quadrant of Plant City. This quadrant is anticipated to support and accommodate residential demand in the form of a “Village” style growth and development pattern envisioned by the Master Plan.

The Preferred Land Use Scenario Map, which was adopted as part of the Northeast Plant City Area Master Plan, is a graphic representation of the Master Plan. The Planning Commission is working jointly with Plant City staff to assess and update the Preferred Land Use Scenario Map.

Over time, emerging development patterns and changes in market demand have prompted the need to review and reassess the appropriateness of the land use patterns shown on the Preferred Land Use Scenario Map. The purpose of this project is to revisit the accuracy of the delineated land uses and to refresh the Map based on current economic and environmental considerations and context.

The overriding objective of this update is to revitalize the effectiveness of the Map as a strategic planning guide for future development in the Northeast Master Plan Study Area. While the update is not intended to be a comprehensive reassessment of the Study Area, it is designed to target specific locations which have been noted over the planning horizon to be experiencing growth and development incongruent with the Master Plan. It is anticipated that minor changes to the Map will include housekeeping type revisions to reflect existing conditions, realigning land use boundaries as needed to reduce the splitting of parcels by land use designations, and generally recognizing land use patterns and delineating them at a parcel level. Strategic land use changes may also be contemplated to reconcile existing and desired future land use scenarios envisioned by the Master Plan and to reflect evolving community priorities.

NE Plant City FLU Master Plan proposed growth scenario map
Plant City logo

Phases

Phase 1

  • Preferred Land Use Scenario Map (2008) Review and Update
  • May – August
  • Ongoing

Phase 2

  • Public Open Houses
  • Early 2024
  • Upcoming

Phase 3

  • Public Workshops
  • Early 2024
  • Upcoming

Phase 4

  • Approval/Adoption of the Updated Preferred Land Use Scenario Map
  • TBD
  • Upcoming

Technical Working Group

Public Engagement

Public Comment

Name
Email
Public comment
Submit

Stay Connected

Sign up for email updates on this project.

Community Meetings

Meetings will be posted here as they are scheduled.

Documents

Supporting Documents

Maps