Hillsborough County Bicycle Network Plan

bike lane

Overview

Committed to improving the mobility and safety of all residents, Hillsborough County and the TPO have identified, evaluated, and prioritized bicycle facility needs along the County’s roadway transportation network. Establishing a data-driven methodology and process to address the mobility and safety needs of people on bicycles will assist in realizing the commitment and desire to provide a safe, connected, and inviting network of bicycle facilities.

Roadway priority screening and corridor planning level studies are complete, to view the report, please click on the links below.

Screening Methodology Memorandum

Appendix C – Waters Ave Corridor Design Concepts

Appendix D – Causeway Blvd Design Concepts

Appendix E – Shell Point Rd Corridor Design Concepts

Appendix F – Balm-Riverview Rd Corridor Design Concepts

Scope of the Study

  • Evaluate Hillsborough County Bike Network
  • Prioritize Based on Need and Connectivity
  • Develop Priority List and Initial Projects

Phases

Phase 1

  • Data Collection and Analysis
  • Winter 2022
  • Completed

Phase 2

  • Road Prioritization and Corridor Studies
  • Summer 2022
  • Completed

Phase 3

  • Final Plan
  • Summer 2023
  • Completed

Public Engagement

Icon

Stay Connected

Sign up to receive email updates on this project.

Public Meetings

Submit a Public Comment

Name
Email
Public comment

Supporting Documents

Maps

Check back soon

Past Presentations & Events

Check back soon