All posts in Livable Roadways

Hillsborough County Bicycle Network Plan

Project Overview Committed to improving the mobility and safety of all residents, Hillsborough County and the TPO are looking to identity, evaluate, and prioritize bicycle facility needs along the County’s roadway transportation network. Establishing a data-driven methodology and process to address the mobility and safety needs of people on bicycles will assist in realizing the…

Top

Plant City Canal Trail Study

Project Overview The Canal Connector Trail was identified as one of three (3) catalyst projects in the Plant City Walk-Bike Plan prepared by the Hillsborough TPO in 2018. The city currently has a very limited amount of active transportation or recreational trail systems that would fit the description of regional context.  Introducing an iconic trail…

Top

University of South Florida to Green ARTery Trail Study (2022)

Based on interviews with partner agencies and community groups and a survey of existing conditions in the study area, two alternatives are proposed to connect the Green ARTery Trail to the USF area shown in the graphics below.  These alternatives have been scored based on their ability to improve safety and meet the goals of…

Top

Hillsborough County Vision Zero Corridor Studies

  Please choose any of these High Injury Corridors below to review the vision zero safety study report results and fact sheets. Surveys were available from September 1 – 30, 2020, the results of the public engagement are within the reports. For more information, view the corridor fact sheets and videos:  Mango Road/CR579 (MLK Boulevard…

Top

Speed Management Action Plan (2019)

Project Overview With the concerning numbers of people hurt and killed on roadways in Hillsborough County, several approaches will be needed to see a reduction in injuries and deaths. Through Vision Zero, there is an acknowledgement that speed plays a significant role in avoiding a crash altogether or at least surviving one. One of the…

Top

Temple Terrace Low-Speed Electric Vehicle/Golf Cart Crossing Study

Temple Terrace’s existing network of local roadways already allow golf carts to operate according to the City’s guidelines. However, the City is divided by two major state roads, 56th St. and Fowler Ave. Therefore, the study focused on crossing these two major thoroughfares to allow all residents to have access to the golf course Temple…

Top

West Tampa Multi Modal Plan (2018)

Please click HERE to view the final report. As part of the “Livable City” vision for Tampa, a robust network of pedestrian and bicycle facilities is critical for both transportation and livability. The neighborhoods of West Tampa have been experiencing a wave of reinvestment, revitalization, and growth; with this there is a need to ensure…

Top

Transportation Level of Service Report

In coordination with the Hillsborough County Development Services Department, the Hillsborough Metropolitan Planning Organization has developed the 2014 Level of Service Report.  The report includes highway level of service for regulated roads within Unincorporated Hillsborough County. Hillsborough County 2020 Level of Service Report (posted July 2, 2020) City of Tampa 2015 Level of Service Report (posted…

Top

South Coast Greenway Trail Study – Symmes Road to Adamo Drive (2018)

Implementation of the South Coast Greenway Trail will assist in completing a major component of the greenways and trails system in eastern Hillsborough County, and provide additional mobility options for the Palm River, Clair Mel, Progress Village, and Gibsonton areas. The trail is included in the Florida Shared-Use Nonmotorized (SUN) Trail Network and will generally…

Top

Morgan Street Complete Street Study (2017)

This report includes urban complete streets design concepts for Morgan Street in downtown Tampa that were prepared by University of South Florida, College of Engineering graduate students. The project was made possible by a grant from the Hillsborough Metropolitan Planning Organization (MPO). The design concepts are presented for consideration by the Hillsborough MPO, the City…

Top

Hillsborough Avenue Multimodal Safety Review (2017)

The W Hillsborough Avenue Multimodal Safety Review was conducted jointly by the Hillsborough County Metropolitan Planning Organization and The Planning Commission in coordination with the Florida Department of Transportation and the City of Tampa. The study has now been finalized and can be viewed here. The purpose of the study was to diagnose the most significant…

Top

Kennedy Blvd Multimodal Safety Review (2017)

The SR60-Kennedy Blvd Multimodal Safety Review was conducted by the Hillsborough County Metropolitan Planning Organization in coordination with the Florida Department of Transportation and the City of Tampa. The purpose of the study was to diagnose the most significant causes of conflict along the corridor and identify strategies to enhance multimodal safety and mobility. The…

Top

Dale Mabry Pedestrian Overpass Feasibility Study (2017)

The Hillsborough County MPO is conducting a feasibility study of various alternatives that will connect the existing section of the I-275 trail which currently terminates at Church Avenue along the north side of I-275, across Dale Mabry Highway, to a proposed trail alignment along the south side of I-275 starting at Himes Avenue. The approximate study…

Top

Bullard Parkway Complete Streets Study (2017)

The Bullard Parkway Complete Streets Study was completed by the Hillsborough Metropolitan Planning Organization (MPO) for the City of Temple Terrace and was approved by the MPO Board on August 1, 2017. Complete Streets is an approach to planning and design which prioritizes safe access, and comfortable and convenient travel. For this reason, the approach…

Top
1 2 3 Page 1 of 3